Nimbus Consulting Helen Martin · Chartered Water & Environmental Manager Get in touch

Nimbus Consulting · Helen Martin C.WEM · United Kingdom

Thirty years of flood and water expertise, applied to your site.

Flood modelling, flood protection and asset management, drought and water resources, Environment Agency permitting and planning support — for organisations, growing businesses and individual landowners alike.

01 — Who I work with

Three kinds of client, one standard of evidence.

A water company drawing up a drought plan and a homeowner facing a flood objection need very different documents. Underneath, they need the same thing: an assessment that holds up when somebody checks it.

Organisations & infrastructure

Evidence that survives scrutiny

Water companies, local authorities and LLFAs, drainage boards, utilities, large estates, and the consultancies working for them.

  • Drought plans, water resources and abstraction strategy
  • Asset condition, scheme optioneering and business cases
  • Strategic flood risk evidence and independent model review
  • Expert witness at inquiry, hearing and examination

Businesses & developers

A consent, on your programme

SMEs, site promoters, architects and contractors who need the water question answered before it holds up an application.

  • Flood Risk Assessments for planning submission
  • Flood Risk Activity Permits and watercourse consents
  • Drainage strategy, sequential and exception test evidence
  • Pre-application discussions handled with the Environment Agency

Individuals & landowners

Where you stand, in plain English

Homeowners, farmers, riparian owners and smallholders dealing with a river, a refusal, or a flood map that looks wrong.

  • What the flood mapping actually means for your property
  • Challenging an objection or a planning refusal
  • Permits for works to a watercourse or a defence
  • Riparian responsibilities and what you can be asked to do

02 — The range

Too much water and too little are the same problem.

Flooding and drought are one catchment measured at opposite extremes. Most specialists work one end of the range. Working across both means the flood case and the drought case come from a single evidence base.

Too much water Too little water

03 — Practice areas

What I’m brought in to do.

Too much water

Flood modelling

Hydrology and hydraulics built to be checked — by a regulator, a reviewer, or an inspector.

  • 1D and 2D hydraulic models: fluvial, tidal, surface water
  • Flood Risk Assessments to national policy and EA standing advice
  • Climate change allowances, sensitivity testing and breach analysis
  • Model build, calibration, and independent model review

Too much water

Flood protection & asset management

Condition, residual risk and maintenance liability, assessed and costed.

  • Asset inspection, condition grading and deterioration profiles
  • Scheme optioneering, appraisal and business case support
  • Maintenance programmes and residual-risk planning
  • Flood warning, resilience and emergency response plans

Too little water

Drought & water resources

Scarcity planning that holds when the trigger levels are actually reached.

  • Drought plans, trigger curves and staged demand restrictions
  • Abstraction licensing, hands-off flows and low-flow assessment
  • Water availability, deployable output and supply-demand balance
  • Abstraction reform and environmental destination readiness

Both ends

Environment Agency regulation

Permits written for the officer who has to determine them.

  • Flood Risk Activity Permits, exemptions and variations
  • Environmental permitting applications and bespoke cases
  • Pre-application engagement and negotiation with EA officers
  • Ordinary watercourse consents and lead local flood authority liaison

Both ends

Planning process & EIA

The water evidence that carries an application through determination.

  • Sequential and Exception Test evidence
  • EIA screening, scoping and water environment chapters
  • Responses to consultee objections and holding directions
  • Expert witness at inquiry, hearing and examination

04 — How the work runs

Four stages, through to determination.

Consenting is a sequence, not a document. Each stage exists because skipping it is what sends schemes back to the start.

  1. Stage 01

    Scope

    A look at the site and the constraints before anything is priced. If the answer is “you don’t need a model”, you hear it here.

  2. Stage 02

    Evidence

    Data, model and assumptions written down where a regulator can find them. Uncertainty stated rather than buried in an appendix.

  3. Stage 03

    Case

    The argument built for whoever decides it — permitting officer, planning committee, or inspector. Different audiences, different documents.

  4. Stage 04

    Determination

    Consultee responses, queries and conditions handled through to the decision. The job finishes when it’s consented, not when the report is issued.

Helen Martin C.WEM · Chartered Water & Environmental Manager

The consultant behind Nimbus

One name on the work, start to finish.

Helen Martin is a Chartered Water and Environmental Manager (CIWEM) with thirty years in flood and water management — modelling catchments, assessing defences, planning for drought, and taking schemes through Environment Agency permitting and the planning process.

Her work sits where technical evidence meets regulation: building the hydrology and hydraulics a decision rests on, then making the case to the people who decide — permitting officers, planning committees and inspectors. Commissions run from strategic work for water companies and local authorities to a single conversation with a landowner about a flood map that looks wrong.

Nimbus Consulting is her independent practice: one consultant, without hand-offs, working UK-wide. The person who scopes the job is the person who does the work and stands behind it at determination.

30 years across flood and drought

Three decades of catchment modelling, permitting and planning evidence as a Chartered Water and Environmental Manager (CIWEM), and a clear view of which arguments survive determination.

Ways of working together

  • Project commissionsDefined scope, fixed deliverable, agreed programme.
  • Retained adviceOn call for a portfolio, a catchment or a development pipeline.
  • Independent reviewSecond pair of eyes on someone else’s model or FRA.
  • Expert witnessWritten and oral evidence at inquiry, hearing or examination.
  • An hour of adviceSometimes a single conversation is the whole job.
  • Specialist inputSub-consultancy support on someone else’s commission.

05 — Common questions

Asked at the start of almost every job.

General guidance, not site-specific advice — every site turns on its own detail. If your question isn’t here, it costs nothing to ask.

Do I need a Flood Risk Assessment for my planning application?

Usually, if the site is in Flood Zone 2 or 3, is larger than one hectare, or the council’s validation checklist asks for one. Some smaller proposals are covered by the Environment Agency’s standing advice instead. A short scoping conversation settles it either way — and if you don’t need one, I’ll say so.

The Environment Agency has objected to my application. Is that the end of it?

No. An objection sets out what the evidence hasn’t yet shown, and it can usually be addressed — better modelling, a changed layout, raised floor levels, or a compensation scheme. The important thing is to respond to what the objection actually says rather than resubmitting the same case.

Do I need a permit for works near a river?

Work on, over, under or within 8 metres of a main river generally needs a Flood Risk Activity Permit from the Environment Agency; smaller watercourses need consent from the lead local flood authority or drainage board. Some low-risk activities are covered by exemptions. Doing the work first and asking afterwards is the expensive order.

The flood map shows my property at risk, but it has never flooded. Can that be challenged?

Sometimes. The national mapping is generalised and can misrepresent individual properties — ground levels, defences and small structures are not always captured. Where the evidence supports it, the Environment Agency has a formal process for reviewing the map for your property.

How long does this take?

A straightforward Flood Risk Assessment is typically a few weeks; one needing new hydraulic modelling is longer, and permit determination has its own statutory clock once submitted. The honest answer arrives after scoping — and programme is agreed before any work starts.

What does it cost?

It depends on what the site actually needs, which is why scope comes first — you get a fixed quote for a defined deliverable before committing to anything. The initial conversation about your site costs nothing.

06 — Show me the site

Mark up a plan, and the enquiry writes itself.

Drop in a map screenshot, site plan or photograph and mark what matters — where the water comes in, what floods, what is already built. It is far quicker than describing it, and it tells me in one look what three paragraphs cannot.

Drop a plan, map screenshot or photo here — or just sketch on the grid.

Your notes

  1. Labels you place will be listed here, and sent with the plan.

Nothing is uploaded. The image stays in your browser until you choose to send it.

07 — Contact

Tell me about the site.

The location, the constraint and the deadline are enough to start. If it isn’t my area I’ll say so and point you at someone whose area it is.

Email helen.martin@nimbusconsulting.co.uk
Based United Kingdom · working nationwide